Project: Sportsman   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Kyle Stone   -  
Project:   Glasair - Sportsman 2+2   -   VIEW REPORTS
Total Hours:1859.9
Start/Last Date:Jul 03, 2019 - Jun 30, 2022
Engine:Lycoming IO-390-EXP
Panel:Garmin G3X w/ GNX375 IFR nav, GNC 255 NAV/COM
 
Friendly URL: https://eaabuilderslog.org?s=Sportsman

Home or Last Project Picture

Aug 30, 2020     Step #60 - Install vent & fuel line fittings - (3 hours)       Category: Systems (IX)
Installed fittings a stated within instructions. Since I'm using the newer 2 vent line system I need to order additional fittings, tubing, and grommets for the RH wing.

Qty 12 - MS35489-6 Rubber Grommet 1/4” x 7/16”
Qty 2 - 320-0250-001 Connector nylon 1/4” x 1/8” NPT
Qty 25 feet - 830-0600-001 Tubing, Nylon, 1/4” OD Type T

Since I am building mine for both Trike and then TD, I need to add quick drains to the low points in the tanks. I'll need to order 4 more if I want to add them now rather than later.

Qty 4 - 320-0344-001 Saf-Air P/N CAV-110 1/8” NPT thread


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.